Six turbines up to 200 m on the Cambrian Mountains near Llanddewi Brefi. Every figure below is taken from the applicant's own documents, with the page to check it.
From the Environmental Statement and supporting documents. Page numbers are PDF pages.
| Item | Value | Source |
|---|


The group re-ran the applicant's shadow flicker test with better terrain. The honest result is below, including where it supports the applicant.
The same turbines, on real LiDAR terrain. Open the 3D model to see the turbines and noise across the landscape, or pick your own home and see the view before and after.
Opens on Waun Maenllwyd with all six turbines placed, the terrain loaded and the noise map calculated. Check the predicted level at any property.
Open the 3D modelSearch your postcode, choose where you stand and which way you look. Switch between before and after, and share a link to your exact view.
Open the view finderTurbine positions and heights from the application (ES Ch 3, Table 3.1). Views are worst case: bare ground, no trees or buildings screening them.
Starting points for scrutiny, not conclusions. Each will be tested with the tools below.
Six layers, built one at a time on this scheme, then reused for others.